Presidential Complex Automatic Door Automation Project
Design, procurement, integration and commissioning of automatic door systems at Türkiye's highest-level administrative complex; uninterrupted operation through centralized PLC management and machine safety.
Timeline
- Start
- January 1, 2024
- Completion
- December 1, 2024
- Contact
- Cumhurbaşkanlığı Külliyesi
- Location
- Ankara
Challenge
Establishing an automation architecture that sustains high-traffic throughput, integrates seamlessly with access control infrastructure and guarantees uninterrupted operation within a facility governed by the highest state protocol.
Solution Approach
Automatic sliding door systems engineered for high-traffic management were installed and integrated with the existing access control infrastructure. All door movements are governed via centralized PLC and automation panels; user safety is ensured at the highest level through sensor-based security layers and machine safety systems.
Project Scope
- Automatic sliding door system design and procurement
- Access control infrastructure integration
- Centralized PLC and automation panel management
- Sensor-based security and machine safety systems
- Commissioning and acceptance testing
Our Reference Project Portfolio
154 kV Transmission Line Relocation Project
Route relocation of a 154 kV transmission line within the national grid infrastructure; end-to-end management of engineering, regulatory approvals and field execution.
154 kV Transmission Line Tower Raising Project
Tower raising engineering and safe field execution under energized conditions for a 154 kV transmission line situated along an industrial facility corridor.
Production Tracking and Barcode Reading System Project
Barcode-based production tracking system delivering end-to-end digital traceability across in-line manufacturing processes; data-driven operational decision infrastructure through SCADA and MES integration.