154 kV Transmission Line Tower Raising Project

Tower raising engineering and safe field execution under energized conditions for a 154 kV transmission line situated along an industrial facility corridor.

154 kV Transmission Line Tower Raising Project

Timeline

Start
January 1, 2025
Completion
-
Contact
Uludağ İçecek A.Ş.
Location
Türkiye

Challenge

Executing tower raising operations safely in close proximity to an energized transmission line while preserving the structural integrity of the existing support system.

Solution Approach

Bearing capacity and structural calculations of existing towers are assessed through detailed engineering analysis; execution designs compliant with national grid standards are prepared and live-line working procedures are strictly enforced.

Project Scope

  • Structural analysis and bearing capacity assessment
  • Raising engineering and execution design
  • National grid technical specification compliance
  • Live-line working procedures